The Data Foundation of EPM Depends on Whether Business Drivers Can Be Clearly Recorded_News_北京智达方通科技有限公司

Company Updates
Company Updates

Stay updated with industry trends and insights, and disseminate in-depth knowledge on smart enterprise management.

Home / About Us / Company Updates / News / The Data Foundation of EPM Depends on Whether Business Drivers Can Be Clearly Recorded
News
The Data Foundation of EPM Depends on Whether Business Drivers Can Be Clearly Recorded

"The budget management system has been running for its second full cycle, and the consolidation reporting software has also been delivered. At this point, the CFO opens the business analysis platform and sees accurate figures summarized by account and organizational structure. He immediately asks: What is the cause of the expense overrun? The system, however, is unable to provide an answer."

The problem in this phenomenon does not lie in the computational capability of EPM, but rather in the fact that the data input into the system was not clearly recorded with business drivers at the collection stage. Data under financial accounting standards records the results of resource consumption, but does not record the business conditions under which the consumption occurred. When an enterprise uses management accounting questions to interrogate data collected according to financial accounting logic, the precision of the system actually obscures the key correlations needed for decision-making.

I. Where the Disconnect Occurs: The Field Design Stage, Not the EPM Implementation Stage

The field design of the reimbursement system aims at approval compliance, while the dimension settings of EPM serve budget control and business analysis. There is a lack of common agreement on the data model between these two design stages.

A manufacturing group we previously served exhibited this consequence in its entertainment expense management. The reimbursement form records "Business Entertainment Expense - East China Region - Handler," and the amount is recorded under the corresponding account during financial closing. The original system's budget rules were set for monthly quota control, and alerts were triggered on time. However, the system could not distinguish whether the overrun came from necessary investments in new customer development or from repeated and inefficient entertainment of the same customer.

The reimbursement system actually contains customer numbers, opportunity stages, and expected order amounts. These fields are already generated during the approval process, but they were not integrated into the expense fact table. This is not a technical obstacle; rather, the design objectives of the reimbursement system and the analytical objectives of EPM were never discussed within the same data model framework.

II. Intcube's Approach: Confirm Driver Fields First, Then Configure Budget Forms

The conventional EPM implementation path is to first define budget accounts, report formats, and approval hierarchies, then configure the system, and finally import data. Intcube's approach is the opposite: first confirm which action, which document, and which traceable identifier each fact entering the budget corresponds to on the business side. If the source system does not have the corresponding fields, EPM cannot generate them on its own; if the source system has them but they are not mapped, the first priority of implementation is to establish the mapping, rather than configuring forms first.

The underlying rationale for this logic is Intcube's multi-dimensional database technology route, whose design goal is to establish causal relationships between business activities in a multi-dimensional model, enabling budgeting and analysis to be simulated and traced based on drivers, rather than merely performing static aggregation of historical data.

In the aforementioned manufacturing group case, the opportunity stage and customer number were integrated as additional dimensions of the expense fact table into the budget control model. After Intcube's adjustment, the entertainment expense alerts showed that overruns were concentrated on customers in the "initial contact" stage, while actual expenditures for those in the quotation stage were below budget. The loss avoided as a result was two rounds of cross-departmental communication and one budget supplement based on incomplete information, rather than the overrun amount itself.

The same logic applies to consolidation reporting and business analysis platforms, though the fields involved are different.

If intercompany transaction differences in consolidation reporting remain only at the account summary level, finance sees only the difference figures. Intcube's approach in such projects is to first confirm the contract number and settlement milestone of each intercompany transaction as necessary fields in the fact table, and then configure reconciliation rules accordingly. Once the fields are in place, differences are automatically categorized into two scenarios: shipped but not invoiced, and invoiced but not confirmed, and finance no longer needs to manually compare them one by one.

The same applies to gross margin fluctuations on the business analysis platform; breaking them down by product and region only presents the results. Intcube's approach is to include the promised delivery date and the actual shipment date in the data foundation, and then establish their correspondence with gross margin changes. Once this step is completed, the respective impacts of price erosion and expedited freight can be distinguished, rather than being mixed into a single gross margin figure.

III. How to Test the Data Foundation: Look at the Driver Coverage Ratio, Not Data Quality

Evaluating the data foundation does not need to wait until the EPM selection stage. Extract the ten accounts with the largest budget execution variances in the previous cycle, and trace the complete field list of actual expenditures in the source system for each transaction. Observe how much of the amount can be mapped to business driver dimensions—such as order number, project number, contract number, or customer number—rather than only department and account. If more than 30% of the amount cannot be mapped, expanding EPM modules will not change the quality of decision-making.

This test measures not data accuracy, but the driver coverage ratio of the data for management questions. An expense with only an account and amount can only answer how much was spent; with an order number and approval node, it can answer whether it should have been spent and which business scenario it belongs to.

Intcube typically conducts the same tracing at the project initiation stage, stratifying the variance amounts by driver coverage. For the portion with low coverage, even if budget rules are configured, they will only repeatedly present results during alerts and cannot support attribution. This step precedes any form configuration and system parameter setting, and determines the range of fields on which subsequent modeling can rely. No matter how powerful the EPM calculation engine is, if the driver coverage at the input end is insufficient, the attribution capability at the output end will be zero.

The dilemma most enterprises face with EPM can be reduced to a long-neglected question: At which stage are business drivers structurally recorded, and who is responsible for mapping them to the EPM dimension system? This problem will not disappear with system upgrades; it will only resurface when the next round of reporting requirements is raised. Intcube's value lies not in providing more budget forms, but in establishing the causal relationships of the multi-dimensional data model before data enters the system. In this way, EPM alerts can possess attribution capability, and the numbers on the business analysis platform can truly answer the CFO's questions.

The system itself does not automatically generate insights; all insights originate from the correspondences established before data enters the system.

Over 300 Corporate Clients are utilizing Intcube EPM